10.21.2025

Work In Progress

The scariest words around here are when hubby says, “Honey, I had an idea” and “I have a plan!”

Once the pool table was relocated to Gary’s house (here), he told me the rest of the story - move everything out of the fiber/fabric/suitcase storage room upstairs, 

turn that back into a bedroom for when the kids (ok, and their parents…) visit, and turn the downstairs room into a playroom for Donovan 

Foosball table is in the works

and storage for me (along with the earthquake supplies.)

Since it’s visible from the front door, I asked for it to be not ugly “pretty”, 

so he built walls around the storage racks and suggested hanging quilts on them. Smart man!

Which is a long way of saying I haven’t gotten much quilting done recently. 

 Folded tonight

I’ve been folding and sorting and being thankful I gave away sooooooo much stuff to the guild’s spring fabric sale (here) and don’t have to move that downstairs too. 

 3rd row is 2 bins of fat quarter (sorted into cool/warm colors), 1/2 yds cuts and 1-3 yard cuts

Most of the fabric is sorted and put away, either in bins or on the shelves in my sewing room. 

 My little rainbow

Which leaves the weaving/spinning/other craft stuff that needs a home or to be given away. 

 To be sorted…

I really thought it was time for the weaving yarns to go… but I’m not ready, so they’re staying. 

 Earthquake food on the left, weaving on the right

With Cyrus (Addy) possibly moving in next fall, I’ll have a crafting buddy in the house and she’s interested in learning to weave... That’s my excuse and I’m sticking to it.


0 comments: